Eastwood Drainage

Client: Ryde City Council
Status: Design Complete

Eastwood Town Centre is currently subject to significant flooding during rare flood events.  The flooding has a substantial impact on the properties in the area with potential flood depths reaching 1.4m through the town centre.

enstruct were engaged to undertake a design for the augmentation of the in ground drainage through the town centre to reduce the flooding extent to an acceptable level.  Works included the modelling of the impacts of the drainage upgrade and full documentation of the major drainage system upgrade.