enstruct

Structural & Civil Engineers

Listen. Challenge. Deliver.
 

Sydney Equestrian Centre

Client: SIEC / Office of Sport
Status: Complete

enstruct were engaged by the NSW Government to design the replacement of a number of timber bridges across the SIEC site. These bridges were nearing the edge of their design life and required immediate upgrading.

A rock gabion structure was proposed to double as a bridge but to also hold the stormwater pipework for stormwater conveyance. The rock gabion structures provided a cost effective solution which matched the existing infrastructure style on site.

This work included the coordination of subcontractors, design checks to confirm stormwater conveyance capabilities, delivery of specifications and the design of new footbridges and footpaths across the site.

Similar Projects